Filtrona’s filter manufacturing plant in Jarrow UK is the
group’s European hub for filter production and development. It is a
place where production efficiency and quality control are
imperative. The proven FlexLink FRS technology increased quality
control and product traceability at Filtrona. Filtrona previously operated a LIFO (Last in First Out)
reservoir. The system provided poor traceability and due to the
flow of product through the system, faulty products could
potentially be immobile in the reservoir for days. Before the
installation of the FlexLink FIFO Reservoir System (FRS), products
were manually fed directly into the dual filter making machines.
The FlexLink FRS technology has been developed with the support of
a global FlexLink network and offers the market a cost efficient
alternative to existing FIFO reservoirs. Further product changeovers were complicated and messy,
resulting in unnecessary downtime and production inefficiency.
Quality checks and monitoring production flows through the process
were complicated and time
consuming. Easy and efficient operator access
Three FlexLink FRS units have been successfully installed at the
Filtrona Jarrow site. Each operating as independent reservoir
systems to provide a continuous product flow into three independent
machines. The solution at Filtrona was designed to allow for easy,
efficient operator access. This was achieved via a series of
operator access points along the system. When asked about the FlexLink FRS installation and the results
it has achieved for Filtrona at Jarrow, Mr David Bowden Engineering
Manager stated; “It quite simply gives us better traceability, and
that is critical in ensuring the high quality of our
products.”
Improving flexibility and reducing WIP
The FRS operates on a First In, First Out basis, where products are
fed into the system between production processes and transported
through the FRS Reservoir providing consistent product flow.
Each FRS unit contains two cells which accommodate for two separate
product in-feeds. The FRS units provide an advantage over
traditional reservoir systems, by allowing both units to be fitted
into different machine layouts as required. Impressed with the FlexLink proposal for a FIFO system and
confident in their proven track record within the industry; Mr.
Bowden highlighted the extended benefits of the FlexLink FRS
installation at Filtrona, Jarrow go beyond their current
capabilities; “We now have the flexibility to directly link
machinery, and therefore reducing WIP and the associated
waste.” |