Just in time production
requirements Keeping production running optimally is critical to
meeting just in time delivery requirements in the automotive
industry. As a result, the efficiency and reliability of production
and materials handling equipment is important to the ongoing
success of manufacturing operations. MAHLE Engine Components Australia, at the
Laverton North plant in Victoria, supplies leading car producers
including Ford and General Motors. They turned to a system builder
to install a materials handling solution that could improve
efficiency and meet the increasing business of original equipment
manufacturers. The system builder specified FlexLink’s XH pallet
handling system, based on its modularity and ability to adapt to
changes in the production process. The equipment also met the
company’s needs for low maintenance and reliability in harsh
conditions. Prior to its installation, partly machined
pistons were loaded and unloaded from individual cells by hand and
then transferred in trays to the next machine in the line. The
cells have been linked with FlexLink conveyors, providing MAHLE
with a fully integrated system. Pallet system in an automated
sequence
“The system takes cast pistons from an unmachined state right
through to the finished product in an automated sequence,” explains
Steve Karavendzas, Sales Engineer for FlexLink. “This involves each
piston being transported on specially molded pallets to and from
the machining cells at speeds of up to 8m/min, where loading and
unloading is performed by an overhead gantry unit,” he says. A low
level conveyor then returns the empty pallets to the beginning of
the line. When the company relocated production to the
Laverton North site last year, the flexibility of the design
enabled MAHLE engineers to quickly and cost effectively rebuild
lines simply by modifying existing conveyors. “To take into account the new plant layout, the
U-shaped lines were shortened and reconfigured into a straight line
connecting each of the machining cells,” says Brendon Cross,
Maintenance Group Leader at MAHLE Engine Components Australia. “The
spare components were then used to construct another
line.” Another important factor concerning MAHLE was
the installation time. In order to minimise production downtime
during the project, the system had to be disassembled, reconfigured
and installed in less than two weeks. The modularity and
versatility of FlexLink’s component range reduced the engineering
and assembly time, ensuring installation deadlines were
met. Operating for 12 years in a harsh
environment
“In addition to automating production, linking the cells in each
line has increased capacity to 6,000 pistons a day and reduced lead
times by virtually eliminating manual handling operations,” says
Brendon Cross. Furthermore, the installation has been
operating efficiently for twelve years in a tough environment. The
application has provided MAHLE Engine Components Australia with a
profitable, flexible and durable automation solution.
|