The first FlexLink conveyor installation in Walldürn was made in
1986 for a knife-grinding machine. Thereafter different FlexLink
material handling projects have been installed in almost all
production, assembly and packaging departments throughout the
entire plant. FlexLink turnkey systems are today delivered from several system
partners, machine builders and directly from FlexLink Systems GmbH
in Frankfurt. The system concepts are all made by Braun’s project
engineers depending on internal capacity available, built with
advice and project support of the FlexLink engineers. In addition
to the proven reliability, Braun appreciate the good looks of their
FlexLink installations and the almost unlimited possiblities for
making changes and rebuilds. |